Personal account Sign in and register
Post an ad

Building in mesa geitonia, limassol

Limassol, Mesa Geitonia
Posted: 21.11.2024 23:46 Ad ID: 5197500
Building in mesa geitonia, limassol-1 Building in mesa geitonia, limassol-2 Building in mesa geitonia, limassol-3 Building in mesa geitonia, limassol-4 Building in mesa geitonia, limassol-5
Translate to: Ελληνικα English Русский Deutsch
Show original

Construction began on 1 September 2022. Delivery date is expected to be in July 2024. The building is constructed in two plots of total area 2183 sq.m. It comprises of five floors of offices, of total covered area of 3017 sq. m. On the ground floor there is a lobby of 68 sq.m., with additional covered area of 412sq.m. The total building construction is about 3500 sq.m. Below the ground floor, there is the mechanical floor, which in the rear part is a parking place (see below). Because of the morphology of the ground, this is underground in the rear of the plot, but street level at the front. You can see more details in the attached detailed drawings. The plots are adjacent to the Limassol-Nicosia motorway on the North side, between the round abouts of Ayia Fyla and Mesa Geitonia. There is easy access via the exit of the motorway in front of the Mediterranean Hospital. Access is also possible from the Mesa Geitonia round about. With the revision and the addition of the underground parking, parking spaces have increased to 75.

Regarding the roof garden, it will be used exclusively by the owners of the fifth floor.

Request information from seller
Your name*
Your phone*
Your email
Your message
Run a full technical and legal real estate check today

Similar ads



19.000.000
€6.348/m²
Call
+35XXXXXXXXX
MySpace Real Estate MySpace Real Estate
Verified account

Posting since may, 2023

Other ads from this seller
Share
×

You need to pass document verification to proceed
Take a photo of document
Scan your face by camera
Pass document verification
After passing documents verification you will be able to create ads and contact sellers.
Your document verification is now being processed.
This usually takes up to 60 minutes.
After passing documents verification you will be able to create ads and contact sellers.
Error 400
Save your searches!
Push "Save search" button on a search result page
Check for updates in favorites section
Add ads to favorites
Push the star button and this ad will be in your favorites section, where you can easily look at it again!
This website uses cookies
We use cookies to improve your experience as a user and our services, analyzing the navigation on the website. Please review our Cookies Policy.